This guys a full of BS with a love letter with more red flags than a Chinese flag.....hahah
"We have been working through various scenarios regarding our current nickel resource1
, pit design and projected drilling next year. These are being finalised and will be an integral part of the scoping study"
Drilling could have been done this summer... why wait for another year? (Unless you want to run out of money and do a CR at 0.05???
I have commenced a tender process for potential providers of Engineering Procurement and Construction Management (EPCM), including Ausenco who undertook all of Canada Nickel’s development study work.
Without a scoping study, feasibility study or dfs, pfs... but looking into engineering procurement? another HUGE red flag promise
If they did the basic on drilling to increase resources to a huge scale and metallurgical work to prove is economic...
- Forums
- ASX - By Stock
- Ann: Shareholder letter regarding ASO progress in Canada
This guys a full of BS with a love letter with more red flags...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASO (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(4.00%) |
Mkt cap ! $16.83M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.3¢ | $6.504K | 500.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 3783228 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 174639 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 3783228 | 0.012 |
5 | 3233333 | 0.011 |
7 | 1433712 | 0.010 |
5 | 549997 | 0.009 |
4 | 337230 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 174639 | 1 |
0.014 | 8100 | 1 |
0.015 | 339730 | 2 |
0.016 | 2273526 | 6 |
0.017 | 700000 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
ASO (ASX) Chart |