-
Share
233 Posts.
37
01/08/18
17:24
Share
Latest Qtly Report Highlights states:
*Jingemia Field currently has two wells online and producing.
• L14 Joint Venture Plans for two more wells to be brought online in Q3 CY2018.
I would have thought that this info would be material, even though no ann was forthcoming.
Last I heard it was shut down.
-