My figures are definitely back of the beer coaster. No operating costs are accounted for.
my point is that there is near enough to 20c of gold per share and we are at 1c.
imho we should be at 5c. History is dragging us back.
- Forums
- ASX - By Stock
- Ann: Sherwood High Grade Zone larger than expected
My figures are definitely back of the beer coaster. No operating...
-
- There are more pages in this discussion • 215 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVG (ASX) to my watchlist
|
|||||
Last
2.5¢ |
Change
-0.007(21.9%) |
Mkt cap ! $7.027M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.5¢ | $2.707K | 107.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 23571 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 19500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23571 | 0.021 |
1 | 50049 | 0.020 |
1 | 10500 | 0.019 |
2 | 200 | 0.015 |
1 | 500000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 19500 | 1 |
0.034 | 49438 | 1 |
0.039 | 13751 | 1 |
0.040 | 65307 | 2 |
0.045 | 100000 | 1 |
Last trade - 15.38pm 26/07/2024 (20 minute delay) ? |
Featured News
SVG (ASX) Chart |