    Looks like organising, mobilising and drilling starts late november, then drill pad concrete pour december and drill bit hitting January.

    With the second hole being completed Feb/March.

    Very, very exciting.

    Expecting a lot of news flow from here on out as SHP mobilises drills, drill pad concrete is poured (very unique drilling equipment requires full concrete pads) = the 8 week time period, then drilling announcements, then potash seam hit announcement, and then MRE and Scoping Study read out.

    x2 for the two holes.

    Exciting.
 