Agreed. Things like this are always a possibility when pressures are increased following new wells being brought online. Odd that the problem was in the flare system though. My guess is they had a blowdown valve leak.
Moving maintenance from the July shutdown earlier also defers some of the peak production period beyond the 30th June end date for the temporary petroleum tax. Would save them a few million in tax.
- Forums
- ASX - By Stock
- Ann: Shut-in of Bauna production
Agreed. Things like this are always a possibility when pressures...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
|
|||||
Last
$1.72 |
Change
0.060(3.61%) |
Mkt cap ! $1.378B |
Open | High | Low | Value | Volume |
$1.67 | $1.73 | $1.67 | $18.60M | 10.89M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 48682 | $1.72 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.73 | 130076 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 48682 | 1.715 |
7 | 213421 | 1.710 |
5 | 111424 | 1.705 |
6 | 114813 | 1.700 |
2 | 26104 | 1.695 |
Price($) | Vol. | No. |
---|---|---|
1.725 | 19000 | 1 |
1.730 | 112065 | 9 |
1.735 | 65209 | 4 |
1.740 | 204350 | 8 |
1.745 | 125940 | 8 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online