Ann: Sidi Dhaher Oil Discovery - Ready for Testin, page-19

  1. 22 Posts.
    re: Ann: Sidi Dhaher Oil Discovery - Ready fo... Thanks for the clarification.

    Didn't doubt you as I know you are a competent poster and very objective as well.

    Gadaffi has been reported captured. Getting a flow test equipment/workover rig just got better. I would believe ADX will spread their dragnet into Libya in serach of the rig. I presume their should be loads of idle workover rig in Libya now. Logistics should be improved with the news coming from libya.

    I beleive that if the comapany want s to do this flow test and declare commercial the well before AGM, then realistically the flow test equipment should be in site before next weekend as they need to allow 10-14 days to carry out a sustained production flow testing. With the event of the additional zones of interest included, then they need to be quick with the all issue.

    Hope all ends well.

    GLA

    Abbey.
 
watchlist Created with Sketch. Add VIL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.