I'm assuming any day between now & mid-2022 based on that timeline.
8 months representing the max amount of time one may need to wait. Hopefully, much earlier.
12 months till production from plant refurb start date, so sometime in H1 2023 (which technically could be mid-year).
12-18 months till production & CF isn't long to wait in the mining game.
- Forums
- ASX - By Stock
- Ann: Significant Copper Intersections from Nifty West Drilling
I'm assuming any day between now & mid-2022 based on that...
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $53.40M |
Open | High | Low | Value | Volume |
3.4¢ | 3.5¢ | 3.2¢ | $26.94K | 806.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 126221 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 126221 | 0.032 |
4 | 333300 | 0.030 |
3 | 533248 | 0.029 |
2 | 532061 | 0.028 |
4 | 3138062 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 300000 | 1 |
0.035 | 70620 | 1 |
0.036 | 289495 | 2 |
0.037 | 474254 | 3 |
0.038 | 421845 | 2 |
Last trade - 15.32pm 07/10/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |