EMR 3.52% $3.53 emerald resources nl

Just consider that you'll need to drive out your trucks, which...

  1. 59 Posts.
    lightbulb Created with Sketch. 17
    Just consider that you'll need to drive out your trucks, which means a maximum gradient on the ground surface and you'll want at least two tucks wide all around your spiraling road down. Rough maths here so forgive me if I'm miles off (pun intended) but at around 3% slope a 462m deep hole would need 13.86km of road to travel down to it at roughly 20m wide is about 277km2 of space around your actual mine.

    So there would be a theoretical limit
 
watchlist Created with Sketch. Add EMR (ASX) to my watchlist
(20min delay)
Last
$3.53
Change
0.120(3.52%)
Mkt cap ! $2.316B
Open High Low Value Volume
$3.45 $3.56 $3.44 $5.236M 1.493M

Buyers (Bids)

No. Vol. Price($)
6 59487 $3.53
 

Sellers (Offers)

Price($) Vol. No.
$3.54 30638 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
EMR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.