The full drilling is required to allow the shape of the ore body to be confirmed, only then can a fully JORC'd reserve/resource be declared which will be used to raise funds. Also the data is needed so as the depth, diameter and pit wall angles of the open pit mine can be calculated.
- Forums
- ASX - By Stock
- EMR
- Ann: Significant Exploration Results Continue at EMR Prospects
Ann: Significant Exploration Results Continue at EMR Prospects, page-26
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.87 |
Change
0.030(0.78%) |
Mkt cap ! $2.541B |
Open | High | Low | Value | Volume |
$3.91 | $3.95 | $3.85 | $6.750M | 1.719M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 6709 | $3.87 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.90 | 1485 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 6709 | 3.870 |
4 | 13742 | 3.860 |
1 | 7529 | 3.850 |
4 | 14894 | 3.840 |
1 | 1485 | 3.830 |
Price($) | Vol. | No. |
---|---|---|
3.900 | 1485 | 1 |
3.910 | 11341 | 4 |
3.920 | 9014 | 2 |
3.930 | 9144 | 3 |
3.940 | 11485 | 2 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
EMR (ASX) Chart |