If you assume long term price of 6% spod con is US$800/t, then in ground 1.5% Li20 is max US$200/t (because u need 4t at 100% recovery to make 6%) not taking into account extraction, processing, transport costs which would reduce this. Still big numbers, but $10k/t for in ground value is not right if you make concentrate. If you make your own hydroxide then you might need 40t of ore for 1t hydroxide, but you might get US$20k for it, so max in ground rises to $US$500/t less all the costs as above. You also need to amortise CAPEX in both scenarios and mine life needs to support each operation option.
- Forums
- ASX - By Stock
- Ann: Significant Exploration Target Defined at Cancet Project
If you assume long term price of 6% spod con is US$800/t, then...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MTC (ASX) to my watchlist
|
|||||
Last
21.0¢ |
Change
-0.010(4.55%) |
Mkt cap ! $41.28M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 21.0¢ | $15.69K | 73.26K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 33882 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 28789 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 33882 | 0.210 |
3 | 26627 | 0.205 |
1 | 50000 | 0.200 |
3 | 56000 | 0.185 |
2 | 22888 | 0.170 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 28789 | 3 |
0.225 | 24522 | 3 |
0.230 | 720000 | 2 |
0.235 | 10000 | 1 |
0.240 | 4000 | 1 |
Last trade - 15.59pm 30/07/2024 (20 minute delay) ? |
Featured News
MTC (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online