From page 10 of the quarterly:
"An integrated geophysical program is underway to support ongoing exploration within the EverleighWell target area. The program includes the acquisition of data by a number of geophysical methodsand the integration and modelling of this data in conjunction with existing geophysical data in the area.The processing will use petrophysical data measured from the recent DD program at Everleigh Well.The geophysical models will be constrained by this real-world petrophysical data. These models willbe used in conjunction with the geological and assay data from the DD program to improve thetargeting at Everleigh and increase the probability of success in future drilling programs."
This is all I can find on activity in the quarterly. No big action in the immediate future.
- Forums
- ASX - By Stock
- Ann: Significant Gold Discovery at Guyer
From page 10 of the quarterly:"An integrated geophysical program...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICL (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.63M |
Open | High | Low | Value | Volume |
3.9¢ | 3.9¢ | 3.9¢ | $8.693K | 222.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 85947 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 85947 | 0.039 |
2 | 85000 | 0.036 |
2 | 246366 | 0.035 |
2 | 202941 | 0.034 |
6 | 631771 | 0.033 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 10000 | 1 |
0.043 | 120000 | 1 |
0.047 | 190000 | 1 |
0.049 | 200000 | 2 |
0.053 | 6733 | 1 |
Last trade - 15.55pm 01/10/2024 (20 minute delay) ? |
Featured News
ICL (ASX) Chart |
The Watchlist
BM8
BATTERY AGE MINERALS LTD
Nigel Broomham, CEO
Nigel Broomham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online