"the remainder of the planned three phase RC drilling programme of 2,430 metres at Eelya South will be completed by the end of January 2020. The assay results from the January 2020 RC drilling are expected to be available during the first quarter of 2020."
"Hollandaire prospect has intersected a significant extensional mineralisation that is 18.0 metres thick in drillhole 19HORC029"
.... 18 metres thick ... nice ....
- Forums
- ASX - By Stock
- CYM
- Ann: SIGNIFICANT HIGH GRADE EXTENSION INTERSECTED AT HOLLANDAIRE
Ann: SIGNIFICANT HIGH GRADE EXTENSION INTERSECTED AT HOLLANDAIRE, page-2
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CYM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
0.001(2.04%) |
Mkt cap ! $76.23M |
Open | High | Low | Value | Volume |
4.9¢ | 5.2¢ | 4.8¢ | $98.72K | 1.982M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 76924 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 626748 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 76924 | 0.050 |
4 | 910416 | 0.048 |
3 | 322765 | 0.047 |
3 | 280000 | 0.046 |
3 | 64000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 250000 | 2 |
0.052 | 310161 | 3 |
0.053 | 1000423 | 1 |
0.054 | 700000 | 2 |
0.055 | 400000 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
CYM (ASX) Chart |