Correct that's what has been disclosed to date, note the absence of timing. Potentially big differences between 24hour vs 30 minute leach in terms of CAPEX impact for instance as the leach plant has to be 48 times larger for the same throughput if it was 24 hours, yet they have not disclosed this key parameter - if it is a non-issue why not disclose? I certainly asked them about this but no response. The CEO also mentioned they'd done some other basic network, this is what he promised some details on but didn't follow through with verbally or via message or email. Still might work out. GLTA.
- Forums
- ASX - By Stock
- Ann: Significant Maiden JORC Resource for Tiros Project, Brazil
Correct that's what has been disclosed to date, note the...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
31.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 19542 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.5¢ | 14420 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 19542 | 0.300 |
1 | 13000 | 0.295 |
2 | 33945 | 0.290 |
1 | 3500 | 0.285 |
1 | 5000 | 0.280 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 14420 | 2 |
0.320 | 29376 | 1 |
0.350 | 22000 | 1 |
0.360 | 46064 | 2 |
0.390 | 30000 | 1 |
Last trade - 12.00pm 07/10/2024 (20 minute delay) ? |
Featured News
RAU (ASX) Chart |
Day chart unavailable