Read the prospectus, they already did a fair bit of met work (they summed it up with one line saying [we did metwork in 2023], also look up previous announcements pre ASX listing on their website. Noteworthy is that they did not disclose the leach duration, the leach was at two steps 3.5 and 4.5 pH at 80 degrees (not at all comparable to conditions tested by MEI and VMM at ambient temperatures) either by error or by intentional omission and did not correct. I asked the CEO a few questions months before the ASX listing regarding their completed metwork before ASX listing, he promised answered only to then go silent despite follow up. Too many red flags for me. Anyway I won't harp on about it as I don't have a dog in the fight here.
- Forums
- ASX - By Stock
- RAU
- Ann: Significant Maiden JORC Resource for Tiros Project, Brazil
Ann: Significant Maiden JORC Resource for Tiros Project, Brazil, page-9
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.0¢ |
Change
-0.005(1.69%) |
Mkt cap ! $11.90M |
Open | High | Low | Value | Volume |
30.0¢ | 32.5¢ | 27.5¢ | $45.93K | 152.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.5¢ | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.290 |
3 | 16500 | 0.280 |
2 | 47126 | 0.275 |
2 | 10277 | 0.260 |
2 | 6000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.295 | 5000 | 1 |
0.300 | 24046 | 1 |
0.320 | 29187 | 1 |
0.360 | 38000 | 1 |
0.390 | 30000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
RAU (ASX) Chart |