MNS 0.00% 4.2¢ magnis energy technologies ltd

Here you go Sroyle, Here is a bridge pic that I am sure trucks...

  1. 697 Posts.
    lightbulb Created with Sketch. 176
    Here you go Sroyle, Here is a bridge pic that I am sure trucks will have to go over to get there. Manhattan bridge I believe. Well some trucks. I know how you love a good bridge pic.

    1920px-Manhattan_Bridge_panorama,_July_2017.jpg

    Now would it be fair to say Magnis is still in the process of fitting out the area they will be working in? Now if you were in charge of this operation would you move the equipment into the area you are fitting out so you can move it ten times so you can work around it or would you store it close to the area you are fitting out/refurbishing (maybe another building close by) and move it in once you are good to go?

    Now we are both assuming but who makes more sense. Me who has been in charge of multi million projects or you who seems to fill his days posting on a stock he does not hold. Should I flip the minute timer?
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.