Intersting that he's saying hoping to see (significant) maiden JORC by June 30. At the current rate will probably only have first five holes drilled. I've long thought, considering how slowly the drilling was going, that it would be prudent to put out an initial estimate well before we'd finished all 10 holes. I mean if it is anywhere near what they are thinking, the resource based off even half the holes should be enough to blow a lot of other companies out of the water. Seems like maybe they are thinking the same thing.
- Forums
- ASX - By Stock
- Ann: Significant Resource Upgrade at Burke Graphite Project
Intersting that he's saying hoping to see (significant) maiden...
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.0¢ |
Change
0.020(6.06%) |
Mkt cap ! $39.20M |
Open | High | Low | Value | Volume |
33.5¢ | 37.5¢ | 33.5¢ | $50.80K | 139.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7750 | 35.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
37.0¢ | 53000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7750 | 0.350 |
1 | 8826 | 0.340 |
2 | 2001 | 0.330 |
1 | 3076 | 0.325 |
2 | 13000 | 0.320 |
Price($) | Vol. | No. |
---|---|---|
0.370 | 53000 | 1 |
0.375 | 41902 | 2 |
0.380 | 1724 | 1 |
0.400 | 12552 | 2 |
0.420 | 2702 | 1 |
Last trade - 15.20pm 23/08/2024 (20 minute delay) ? |
Featured News
LEL (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online