GBZ 10.0% 0.9¢ gbm resources limited

Ann: Significant Resource Upgrade at Twin Hills Project, page-2

  1. 574 Posts.
    lightbulb Created with Sketch. 301
    Cut off grade dropped to 0.4 g/t because they are proposing to OPEN PIT twin hills

    this is an absolute game changer because previous owners failed with underground, the resource didn’t work for the method they used. Open pit on the other hand will pick up all the oz

    giddy up!!
 
watchlist Created with Sketch. Add GBZ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $10.41M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $6.817K 715.0K

Buyers (Bids)

No. Vol. Price($)
2 771103 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 233773 1
View Market Depth
Last trade - 12.07pm 05/07/2024 (20 minute delay) ?
GBZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.