Scoping Study update
As these latest results are located within the optimized Stage One Starter Pit area, the engineers
have advised us that this data has huge material upside implications to the Scoping Study’s
economics and have sought an extension of time to include all drilling until after the scheduled
resource upgrade for Korbel Main later in the year with minimal additional cost. With the current
Scoping Study 80% completed, the Board will consider this cost saving and extension request in
line with the best interest of shareholders. The Korbel Main resource upgrade is scheduled to be
completed in Q4 2021.
Long-term, this decision is probably for the best.
- Forums
- ASX - By Stock
- Ann: Significant results continue at Korbel Main
Scoping Study updateAs these latest results are located within...
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.0¢ |
Change
0.010(3.70%) |
Mkt cap ! $59.63M |
Open | High | Low | Value | Volume |
28.0¢ | 28.0¢ | 28.0¢ | $6K | 21.42K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 27.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.0¢ | 4233 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 0.270 |
1 | 20000 | 0.265 |
3 | 150028 | 0.260 |
2 | 40000 | 0.255 |
4 | 64502 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.285 | 39000 | 1 |
0.290 | 7241 | 1 |
0.305 | 39644 | 4 |
0.310 | 9826 | 1 |
0.315 | 7626 | 3 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
28.0¢ |
  |
Change
0.010 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
27.0¢ | 28.0¢ | 27.0¢ | 5170 | ||
Last updated 11.32am 03/05/2024 ? |
Featured News
NVA (ASX) Chart |