Ann: Significant Results from Jericho Resource Extension Drilling, page-13

  1. 35,474 Posts.
    lightbulb Created with Sketch. 2259
    Assuming infill grade control drilling verifies Jericho is economic to mine I am guessing the following steps would be taken :

    Looks like they are stoping out Matilda in a retreat method , from the diagram .
    So maybe they will finish stoping out matilda before going to Jericho ?


    Once Matilda is stoped out they could then extend the bottom level through to Jericho , and if they use that as a drive for removing ore from jericho I am guessing they may want to widen it from say 4 meters to 5-5.5 meters , so wide enough for a truck , and also for temporary ventilation.

    Lets say a TB Jumbo does a leasurely 250 meters of level development in a month they could be into taking low grade development ore out in 6 months time from the bottom level extension into Jericho

    Guessing they would want to put in 3 or 4 levels of say 300 meters in length so say 1600 meters (inc crosscuts/ loading bays ) of development ore ( cc 150 K tonnes ) over 6 months so 6 months to start and 6 months development to complete so a year before they start taking out high grade stoping ore ?

    A paste plant would be nice to have with bottom up mining that they can do now

    Welcome to be flamed or corrected on the above
    Last edited by plough: 24/01/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
35.0¢
Change
0.005(1.45%)
Mkt cap ! $201.4M
Open High Low Value Volume
34.5¢ 35.5¢ 34.0¢ $487.8K 1.403M

Buyers (Bids)

No. Vol. Price($)
3 48186 34.5¢
 

Sellers (Offers)

Price($) Vol. No.
35.5¢ 171774 5
View Market Depth
Last trade - 16.10pm 17/06/2025 (20 minute delay) ?
A1M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.