Assuming infill grade control drilling verifies Jericho is economic to mine I am guessing the following steps would be taken :
Looks like they are stoping out Matilda in a retreat method , from the diagram .
So maybe they will finish stoping out matilda before going to Jericho ?
Once Matilda is stoped out they could then extend the bottom level through to Jericho , and if they use that as a drive for removing ore from jericho I am guessing they may want to widen it from say 4 meters to 5-5.5 meters , so wide enough for a truck , and also for temporary ventilation.
Lets say a TB Jumbo does a leasurely 250 meters of level development in a month they could be into taking low grade development ore out in 6 months time from the bottom level extension into Jericho
Guessing they would want to put in 3 or 4 levels of say 300 meters in length so say 1600 meters (inc crosscuts/ loading bays ) of development ore ( cc 150 K tonnes ) over 6 months so 6 months to start and 6 months development to complete so a year before they start taking out high grade stoping ore ?
A paste plant would be nice to have with bottom up mining that they can do now
Welcome to be flamed or corrected on the above
- Forums
- ASX - By Stock
- Ann: Significant Results from Jericho Resource Extension Drilling
A1M
aic mines limited
Add to My Watchlist
1.45%
!
35.0¢

Assuming infill grade control drilling verifies Jericho is...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
35.0¢ |
Change
0.005(1.45%) |
Mkt cap ! $201.4M |
Open | High | Low | Value | Volume |
34.5¢ | 35.5¢ | 34.0¢ | $487.8K | 1.403M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 48186 | 34.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.5¢ | 171774 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 48186 | 0.345 |
14 | 283246 | 0.340 |
5 | 99206 | 0.335 |
15 | 263157 | 0.330 |
12 | 245392 | 0.325 |
Price($) | Vol. | No. |
---|---|---|
0.355 | 171774 | 5 |
0.360 | 294602 | 5 |
0.365 | 48390 | 3 |
0.370 | 64296 | 3 |
0.375 | 37468 | 3 |
Last trade - 16.10pm 17/06/2025 (20 minute delay) ? |
Featured News
A1M (ASX) Chart |
The Watchlist
RC1
REDCASTLE RESOURCES LIMITED
Ronald Miller, Non-Executive Director
Ronald Miller
Non-Executive Director
SPONSORED BY The Market Online