https://www.linkedin.com/posts/altech-advanced-materials-ag_umstellung-der-werksplanung-silumina-anodes-activity-7135566202940071936-mRwR?utm_source=share&utm_medium=member_androidHey guys! News from AAM.
the last Point of the highlights is very interesting:
translated by Deepl:
The revised technical planning and design of the industrial production plant for Siluminaanodes in Schwarze Pumpe, Saxony, has been completed and the feasibility study (DFS) is to be finalized and published inbe completed and published in 2023
- Forums
- ASX - By Stock
- Ann: Silumina Anodes Project DFS Expands Output 8-Fold to 120GWh
https://www.linkedin.com/posts/altech-advanced-materials-ag_umste...
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $100.8M |
Open | High | Low | Value | Volume |
6.1¢ | 6.1¢ | 6.0¢ | $23.31K | 384.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
37 | 2830930 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.1¢ | 710821 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
37 | 2830930 | 0.060 |
9 | 627813 | 0.059 |
8 | 525250 | 0.058 |
4 | 200500 | 0.057 |
4 | 170000 | 0.056 |
Price($) | Vol. | No. |
---|---|---|
0.061 | 710821 | 4 |
0.062 | 2462259 | 6 |
0.063 | 351539 | 4 |
0.064 | 1185280 | 6 |
0.065 | 1094067 | 4 |
Last trade - 16.10pm 08/05/2024 (20 minute delay) ? |
|
|||||
Last
6.0¢ |
  |
Change
0.000 ( 3.23 %) |
|||
Open | High | Low | Volume | ||
6.1¢ | 6.1¢ | 6.0¢ | 468709 | ||
Last updated 15.34pm 08/05/2024 ? |
Featured News
ATC (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online