The margin figures from Stage 1 : "The cash operating surplus from Stage 1 was $10.2 million, so an average margin of $6,576 per caesium oxide (Cs2O) tonne, or $547 per ore tonne @ 8.3% Cs2O, was generated.
- Forums
- ASX - By Stock
- ESS
- Ann: Sinclair Caesium Mine - Stage 2 evaluation underway
Ann: Sinclair Caesium Mine - Stage 2 evaluation underway, page-13
-
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)