The margin figures from Stage 1 : "The cash operating surplus from Stage 1 was $10.2 million, so an average margin of $6,576 per caesium oxide (Cs2O) tonne, or $547 per ore tonne @ 8.3% Cs2O, was generated.
- Forums
- ASX - By Stock
- Ann: Sinclair Caesium Mine - Stage 2 evaluation underway
The margin figures from Stage 1 : "The cash operating surplus...
-
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated