Having found a first small bleb of pollucite under the Dome it would be scandalous to now walk away from the opportunity to locate "the big one" - a TANCO-type 300KT pollucite monster which could generate TANCO-type revenues of US $ 1 billion and keep the oil industry supplied with Cs formate brine for another decade or more. The soil geochemistry and the ternary radiometrics point to the possibility of Cs/Rb/K/Li treasure at multiple locations along the Dome's Pegmatite corridor - and the market needs high-grade Cs ore, so lets get after it .
- Forums
- ASX - By Stock
- ESS
- Ann: Sinclair Mine Complete, First Caesium Shipment Scheduled
Ann: Sinclair Mine Complete, First Caesium Shipment Scheduled, page-100
-
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)