If PIO now went "monster hunting" they would be looking for a substantial main pollucite body measuring (if it was TANCO-sized) 180 metres long by 75 metres wide in these seven Rank 5 PEGs of typical length 2,000 metres
- Forums
- ASX - By Stock
- ESS
- Ann: Sinclair Mine Complete, First Caesium Shipment Scheduled
Ann: Sinclair Mine Complete, First Caesium Shipment Scheduled, page-112
-
-
- There are more pages in this discussion • 77 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some