re: Ann: Sino Gas - May 13 Phased Work Progra... yes riffci, lots and lots of drilling happening. i guess its easy for us sitting back here, but the enormity of the ammount of work to be carried is probably a bit hard for us to appreciate.
seismic data gathering for whole of project appears to have been completed which is excellent, and it appears likely that some initial results from this might become available this time next month.
LXSG-11 & 12 - 28M. and 24m. pay intervals - up with previous metreage per well from memory, and with "stable" gas flows reported.
sanjiaobei 6 well pay intervals reported - slightly less in metreage per well. "stable" gas flows.
i am waiting for a call back from one of the directors to see if i can get more detail.
There will probably be a progress presentation from RB in the near future given his habit of regularly geeing things along
GK.
- Forums
- ASX - By Stock
- Ann: Sino Gas - May 13 Phased Work Program Progre
re: Ann: Sino Gas - May 13 Phased Work Progra... yes riffci,...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SEH (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online