It's all brand new equipment so it must be design issues. I'm tipping the plant more so than the dozer mining units.
- Forums
- ASX - By Stock
- Ann: Sixth Shipment of HMC Completed at Coburn Project
It's all brand new equipment so it must be design issues. I'm...
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable