As previously reported, SM 6 #2 has already encountered three hydrocarbon bearing sands in the F zone sands
Attempts to free stuck drill pipe were unsuccessful
Current operation is preparing to drill side-track well
Byron Energy Limited (“Byron”) (ASX:BYE) announced on 18 March 2016, that the drill pipe in the Byron Energy SM 6 #2 (“SM 6 #2”) well became stuck at a depth of 8,039 feet (2,451 metres) Measured Depth (7,860 feet/2,396 metres True Vertical Depth), approximately 400 feet above the primary target reservoir, the G 20 Sand.
Over the last three days Byron attempted to free the stuck drill pipe. These attempts were unsuccessful. Byron has begun side track operations at a depth of 7,949 MD feet (2,423 metres) Measured Depth (7,780 feet/2,372 metres) True Vertical Depth) after a successful back off of the drill-pipe. Byron plans to drill the side-track well bore, with a conventional 8 1/2" diameter hole as originally planned, along a path parallel to the originally planned well-bore to a total Measured Depth of 9,516 feet (2,900 metres) (9,138 feet/2,785 metres True Vertical Depth.
Currently, at approximately 5.00 pm (USA Central Time) on 20 March 2016, Byron is preparing to trip in the hole to set a cement kick off plug at a depth of 7,949 MD feet (2,423 metres) Measured Depth (7,780 feet/2,372 metres) True Vertical Depth). Drilling operations should resume later in the week after a required BOP test which will be performed as the cement cures.
The SM 6 #2 well is the first well to be drilled as part of Byron’s farm-out to Otto Energy Limited (“Otto”) (ASX:OEL), announced on 11 December 2015. In order to earn a 50% working interest (equal to a 40.625% net revenue interest) in SM 6, Otto will contribute 66.67% of the total estimated costs of the SM 6 #2 well of $US 8.0 million ($US5.3 million Otto and $US2.7 million Byron). Any costs above $US 8.0 million in respect of the SM 6 #2 well and all future expenditure in SM 6 will be in accordance with Byron’s and Otto’s respective working interest (Byron 50%/Otto 50%).
2
SM 6 #2 is being drilled in water depth of approximately 65 feet (20 metres). The well is being drilled on a prospect in the south west corner of a major salt dome in SM 6, located offshore Louisiana, 216 km southwest of New Orleans, Louisiana, USA.
Byron, through its wholly owned subsidiary Byron Energy Inc. (the operator), currently has a 100% working interest and an 81.25% net revenue interest in SM 6. If Otto earns an interest in the SM 6 block, Byron’s working and net revenue interests will be reduced by 50% at the earn-in point, to 50% and 40.625% respectively.
Byron will issue progress reports as material developments occur.
For further information contact:-
Maynard Smith Peter Love
Chief Executive Officer
- Forums
- ASX - By Stock
- Ann: SM 6 No 2 Well Update
As previously reported, SM 6 #2 has already encountered three...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(4.17%) |
Mkt cap ! $62.33M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.2¢ | $11.22K | 884.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 7533562 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 11016129 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 7533795 | 0.012 |
11 | 6080676 | 0.011 |
2 | 2050000 | 0.010 |
1 | 100000 | 0.009 |
2 | 245123 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 11016129 | 18 |
0.014 | 5287214 | 10 |
0.015 | 6381000 | 14 |
0.016 | 700004 | 2 |
0.017 | 264764 | 2 |
Last trade - 15.35pm 03/07/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO & MD
Anthony Noble
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online