BYE 2.27% 4.3¢ byron energy limited

I'm struggling to understand that sentence without punctuation,...

  1. 6,484 Posts.
    lightbulb Created with Sketch. 949
    I'm struggling to understand that sentence without punctuation, but if I'm interpreting correctly: you're attributing the superficial to lower than expected rates. If so, then sure - everyone including myself can see that. Attributing those rates to a project being a failure is a different beast. I do not for a minute accept that.

    Sure, results haven't met expectations, but that does not mean that the seismic or the field is not quality. In most instances they have intercepted high quality sand where they have expected it. Their drilling success rate is exceptional. These are complex formations. I'm playing a long game, as are management.
 
watchlist Created with Sketch. Add BYE (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
-0.001(2.27%)
Mkt cap ! $46.38M
Open High Low Value Volume
4.4¢ 4.5¢ 4.3¢ $67.59K 1.566M

Buyers (Bids)

No. Vol. Price($)
1 1999999 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 408622 3
View Market Depth
Last trade - 16.10pm 17/05/2024 (20 minute delay) ?
Last
4.4¢
  Change
-0.001 ( 0.00 %)
Open High Low Volume
4.3¢ 4.5¢ 4.3¢ 311933
Last updated 15.44pm 17/05/2024 ?
BYE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.