BYE 0.00% 5.4¢ byron energy limited

Ann: SM69 E2 Well Cased and Cemented, page-13

  1. 4,803 Posts.
    lightbulb Created with Sketch. 2240
    The well timing was on a dry hole basis .
    Basic log run and plug and abandon .

    Most of the time overrun so far would be at standby rates .
    Running the final casing and completion activities are add on to the dry well costs and dry well drill time .
 
watchlist Created with Sketch. Add BYE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.