SUM 2.27% 21.5¢ summit minerals limited

Ann: Soil Geochemistry update at Phillips River Lithium Project, page-71

  1. 422 Posts.
    lightbulb Created with Sketch. 44
    Going back to this, had another read over.

    SUM is not drilling Nb atm... they will look to introduce and fund drilling once they found Nb?

    So if the assays show high Nb, they will look to start drilling in that area correct??

    Can SP hit near $1 just based off the assays alone? (has that ever happened?)

    And I assume share price also goes up once they confirm high Nb and they want to start drilling?
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
-0.005(2.27%)
Mkt cap ! $15.45M
Open High Low Value Volume
22.5¢ 22.5¢ 21.0¢ $203.4K 936.2K

Buyers (Bids)

No. Vol. Price($)
1 2 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 13116 2
View Market Depth
Last trade - 16.10pm 14/08/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.