I don’t c an issue with a CR - eventually one is needed and it would make sense to do one to fund all the superficial sampling after which drilling campaign will begin. The UAV is significant as it will generate readings of what lies in proximity - if there is a correlation then watch out as people will want to get set for further soil and geochemical samples (further 23 areas associated with radon gas). The UAV is extremely important and due within the next fortnight.
a CR doesn’t mean the SP will suffer negatively. We have seen with EQN - if the market sees value it will keep buying into the potential.
- Forums
- ASX - By Stock
- Ann: Soil Grades up to 74,997 ppm U3O8 (7.5%) at Portland Creek
I don’t c an issue with a CR - eventually one is needed and it...
-
- There are more pages in this discussion • 200 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add I88 (ASX) to my watchlist
(20min delay)
|
|||||
Last
47.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.73M |
Open | High | Low | Value | Volume |
47.0¢ | 48.0¢ | 46.5¢ | $30.70K | 65.23K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10682 | 47.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.0¢ | 2761 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10682 | 0.470 |
3 | 51188 | 0.465 |
3 | 22700 | 0.460 |
5 | 28132 | 0.450 |
1 | 20000 | 0.445 |
Price($) | Vol. | No. |
---|---|---|
0.480 | 2761 | 1 |
0.485 | 4452 | 1 |
0.510 | 5850 | 1 |
0.515 | 5000 | 1 |
0.520 | 1541 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
I88 (ASX) Chart |