of course drilling is required. I’d like a drill to be placed at the heart of these super grade anomalies. However, you do understand the topography associated. There is only helicopter access. A temporary access will need to be created. One can’t just go in and decide to create a temporary path and then have limited access. Whilst we are in a hurry they need to ensure they have a complete understanding of the data and the entire area before planning a drill campaign and determine the best targets. Realistically drilling at its earliest will be near the end of the year.
- Forums
- ASX - By Stock
- Ann: Soil Grades up to 74,997 ppm U3O8 (7.5%) at Portland Creek
of course drilling is required. I’d like a drill to be placed at...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add I88 (ASX) to my watchlist
(20min delay)
|
|||||
Last
60.0¢ |
Change
-0.020(3.23%) |
Mkt cap ! $25.60M |
Open | High | Low | Value | Volume |
63.5¢ | 64.5¢ | 60.0¢ | $94.11K | 155.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 31232 | 60.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
62.0¢ | 2000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 41666 | 0.600 |
1 | 15000 | 0.595 |
1 | 3000 | 0.590 |
1 | 1962 | 0.585 |
1 | 1310 | 0.580 |
Price($) | Vol. | No. |
---|---|---|
0.615 | 8523 | 1 |
0.620 | 2000 | 1 |
0.625 | 3178 | 2 |
0.635 | 9100 | 3 |
0.640 | 4000 | 1 |
Last trade - 16.10pm 28/08/2024 (20 minute delay) ? |
Featured News
I88 (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online