The only positives I see in this pile of grammatical errors are "drill" and "2024" mentioned in the same sentence. We need some decent assays to pull this SP out of the mud because BNR isn't going to do it for us.
In saying that I believe the potential is there, I just hope our new management can capitalise on it.
- Forums
- ASX - By Stock
- SUM
- Ann: Soil Program Completed at Phillips River Li Project
Ann: Soil Program Completed at Phillips River Li Project, page-18
-
- There are more pages in this discussion • 129 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.5¢ |
Change
0.035(15.9%) |
Mkt cap ! $20.92M |
Open | High | Low | Value | Volume |
22.0¢ | 26.0¢ | 22.0¢ | $263.0K | 1.073M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 12852 | 24.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.5¢ | 37748 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 12852 | 0.245 |
3 | 119896 | 0.240 |
2 | 38000 | 0.235 |
2 | 90000 | 0.230 |
1 | 20000 | 0.220 |
Price($) | Vol. | No. |
---|---|---|
0.255 | 37748 | 1 |
0.260 | 22554 | 4 |
0.270 | 65000 | 2 |
0.275 | 13370 | 2 |
0.285 | 38357 | 5 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
SUM (ASX) Chart |