SUM 4.35% 11.0¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-46

  1. 1,292 Posts.
    lightbulb Created with Sketch. 118
    At the end of January, we should see the already delayed Castor results. Gower will hopefully be doing his best to expedite the results asap.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
11.0¢
Change
-0.005(4.35%)
Mkt cap ! $5.242M
Open High Low Value Volume
11.5¢ 12.0¢ 11.0¢ $78.95K 686.0K

Buyers (Bids)

No. Vol. Price($)
4 213979 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 26086 1
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
11.5¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
11.5¢ 12.0¢ 11.0¢ 509233
Last updated 15.29pm 10/05/2024 ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.