SUM 2.63% 19.5¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-46

  1. 1,483 Posts.
    lightbulb Created with Sketch. 136
    At the end of January, we should see the already delayed Castor results. Gower will hopefully be doing his best to expedite the results asap.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
0.005(2.63%)
Mkt cap ! $14.01M
Open High Low Value Volume
18.5¢ 21.5¢ 18.0¢ $577.3K 2.921M

Buyers (Bids)

No. Vol. Price($)
11 993073 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
19.5¢ 82056 2
View Market Depth
Last trade - 14.11pm 25/07/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.