SUM 8.77% 31.0¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-46

  1. 1,459 Posts.
    lightbulb Created with Sketch. 135
    At the end of January, we should see the already delayed Castor results. Gower will hopefully be doing his best to expedite the results asap.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
31.0¢
Change
0.025(8.77%)
Mkt cap ! $19.28M
Open High Low Value Volume
29.0¢ 32.0¢ 27.0¢ $1.224M 4.144M

Buyers (Bids)

No. Vol. Price($)
4 77297 31.0¢
 

Sellers (Offers)

Price($) Vol. No.
31.5¢ 26124 2
View Market Depth
Last trade - 16.10pm 04/07/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.