SUM 14.8% 11.5¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-68

  1. 1,292 Posts.
    lightbulb Created with Sketch. 118
    Looking for more opportunities..? Does this suggest our existing ones are dusters? Spreading finances thin or heading for another capital raise, IMO. Hopefully, this is not an indicator of the quality of our existing projects, I had high expectations for Castor.
    https://hotcopper.com.au/data/attachments/5885/5885149-6f20b2fcde486a2e490ef2feb08e9ea1.jpg
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
11.5¢
Change
-0.020(14.8%)
Mkt cap ! $5.481M
Open High Low Value Volume
14.5¢ 14.5¢ 11.5¢ $341.1K 2.680M

Buyers (Bids)

No. Vol. Price($)
3 246000 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 100000 1
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
11.5¢
  Change
-0.020 ( 14.8 %)
Open High Low Volume
15.0¢ 15.0¢ 11.5¢ 1349642
Last updated 15.57pm 09/05/2024 ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.