SUM 6.98% 20.0¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-129

  1. 353 Posts.
    lightbulb Created with Sketch. 28
    Gower is my daddy and this offends me
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.015(6.98%)
Mkt cap ! $9.293M
Open High Low Value Volume
19.5¢ 21.0¢ 19.5¢ $631.1K 3.171M

Buyers (Bids)

No. Vol. Price($)
5 130185 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 52000 3
View Market Depth
Last trade - 14.05pm 27/05/2024 (20 minute delay) ?
Last
20.5¢
  Change
-0.015 ( 7.07 %)
Open High Low Volume
20.0¢ 21.0¢ 19.5¢ 2445101
Last updated 14.23pm 27/05/2024 ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.