The only positives I see in this pile of grammatical errors are "drill" and "2024" mentioned in the same sentence. We need some decent assays to pull this SP out of the mud because BNR isn't going to do it for us.
In saying that I believe the potential is there, I just hope our new management can capitalise on it.
- Forums
- ASX - By Stock
- Ann: Soil Program Completed at Phillips River Li Project
The only positives I see in this pile of grammatical errors are...
- There are more pages in this discussion • 129 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.0¢ |
Change
0.035(13.7%) |
Mkt cap ! $13.34M |
Open | High | Low | Value | Volume |
25.5¢ | 29.5¢ | 25.0¢ | $999.9K | 3.748M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1034 | 29.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
29.5¢ | 40779 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3000 | 0.285 |
7 | 142967 | 0.280 |
2 | 150840 | 0.275 |
3 | 264814 | 0.270 |
2 | 210000 | 0.265 |
Price($) | Vol. | No. |
---|---|---|
0.290 | 56447 | 1 |
0.295 | 105799 | 5 |
0.300 | 194827 | 7 |
0.310 | 110686 | 3 |
0.315 | 103177 | 2 |
Last trade - 14.22pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
28.5¢ |
  |
Change
0.035 ( 18.1 %) |
|||
Open | High | Low | Volume | ||
25.0¢ | 30.0¢ | 25.0¢ | 3358093 | ||
Last updated 14.42pm 05/06/2024 ? |
Featured News
SUM (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online