SUM 32.8% 38.5¢ summit minerals limited

Ann: Soil Program Completed at Phillips River Li Project, page-61

  1. 13,266 Posts.
    lightbulb Created with Sketch. 570
    Why has SUM not participated in the uranium rally whatsoever?
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
38.5¢
Change
0.095(32.8%)
Mkt cap ! $21.88M
Open High Low Value Volume
29.0¢ 38.5¢ 28.5¢ $2.572M 7.432M

Buyers (Bids)

No. Vol. Price($)
1 433 38.0¢
 

Sellers (Offers)

Price($) Vol. No.
38.5¢ 37437 4
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
37.5¢
  Change
0.095 ( 30.3 %)
Open High Low Volume
29.0¢ 38.0¢ 29.0¢ 5145488
Last updated 15.59pm 14/06/2024 ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.