I am not totally convinced that the plant is capable of running at 68 tj per day. They have done "minor" modification during the shut down and slowly ramping up from 28 tj per day. Will watch with interest, but no time line for full production.
Christopher
- Forums
- ASX - By Stock
- COE
- Ann: Sole Gas Project update
Ann: Sole Gas Project update, page-2
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $475.2M |
Open | High | Low | Value | Volume |
18.0¢ | 18.3¢ | 18.0¢ | $1.172M | 6.397M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 276782 | 18.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.5¢ | 227600 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 276782 | 0.180 |
10 | 1294725 | 0.175 |
6 | 535757 | 0.170 |
6 | 402569 | 0.165 |
3 | 324471 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.185 | 227600 | 3 |
0.190 | 741694 | 10 |
0.195 | 697880 | 5 |
0.200 | 883045 | 10 |
0.205 | 628732 | 9 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |