Truth will be when management can show that the high costs were a function of Darlot infrastructure and will not carry over to KOTH. I have my doubts. I did sell
my lot on the first lower high. I like the project but high costs and poor global fundamentals forced me out. Happy with the 170%. Not happy that I didn't sign up for the ingot.
- Forums
- ASX - By Stock
- RED
- Ann: Solid start at King of the Hills with ramp-up on track
Ann: Solid start at King of the Hills with ramp-up on track, page-13
-
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)