Ah, so drilling of Leviathan is now planned for next year sometime.
I had thought that SOR was trying to gain advantage of funding of EIS for drilling of both Leviathan and Cyclops however the drilling period for the EIS funding for Leviathan expires on Thursday.
I wonder if we'll see a new application by SOR for the next EIS round of funding for Leviathan. The next round, due to be announced in April 2024 and has to be drilled between 1/6/2024 and 31/5/2025 overlaps with the drilling period for Cyclops, which has to be drilled by 30/11/2024.
- Forums
- ASX - By Stock
- Ann: SOR AGM Presentation 2023
Ah, so drilling of Leviathan is now planned for next year...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SOR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.9¢ |
Change
0.002(4.26%) |
Mkt cap ! $22.97M |
Open | High | Low | Value | Volume |
4.9¢ | 5.2¢ | 4.9¢ | $30.92K | 604.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 162797 | 4.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 12619 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 162797 | 0.049 |
1 | 28000 | 0.048 |
1 | 30641 | 0.047 |
5 | 578000 | 0.046 |
1 | 10000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 12619 | 1 |
0.052 | 59051 | 2 |
0.054 | 260000 | 3 |
0.055 | 155238 | 2 |
0.056 | 100000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
SOR (ASX) Chart |