Or the more boring but equally important story: if your met is off for some or all of your ore body and your plant isn't ideal you get a nasty suprise later on. requiring re-optimisation or could just be FUBAR and requires big $ to overhaul. Even when not adding size/throughput, just knowing you will achive the production you expect is important, especially on one like this tht isn't so mucha speccy and the anticipated value will come from actua mining in the near future. Think how we'd all feel 24 months from now, dropped big capex, and hearing: recoveries 10% lower than projected, prfoit margins are waaaay down...............
- Forums
- ASX - By Stock
- Ann: Sorby Hills DFS Metallurgical Testwork Results
Or the more boring but equally important story: if your met is...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BML (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.34M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $24.40K | 242.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 236737 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 165301 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 222095 | 0.100 |
2 | 70171 | 0.099 |
1 | 10200 | 0.098 |
1 | 27992 | 0.097 |
3 | 106995 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 165301 | 2 |
0.110 | 13545 | 2 |
0.115 | 60597 | 3 |
0.120 | 96185 | 2 |
0.125 | 70000 | 2 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
BML (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online