it seems from the podcast that the supply from the Precinct is constrained by the capacity of the 132KV line to take any more supply above our planned 85MW. Any increase in our generating capacity would need to wait until the 330KV line to Geraldton is commissioned and we have a line into that.
- Forums
- ASX - By Stock
- STX
- Ann: South Erregulla Peaking Power Plant
Ann: South Erregulla Peaking Power Plant, page-39
-
- There are more pages in this discussion • 221 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
23.3¢ |
Change
-0.003(1.06%) |
Mkt cap ! $666.1M |
Open | High | Low | Value | Volume |
23.5¢ | 24.8¢ | 23.0¢ | $2.823M | 11.78M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
33 | 1306044 | 23.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.5¢ | 818991 | 34 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
32 | 1298679 | 0.230 |
19 | 1036557 | 0.225 |
20 | 1535401 | 0.220 |
18 | 2157999 | 0.215 |
26 | 1400993 | 0.210 |
Price($) | Vol. | No. |
---|---|---|
0.235 | 821342 | 32 |
0.240 | 1142469 | 17 |
0.245 | 1426432 | 18 |
0.250 | 2144947 | 35 |
0.255 | 2302079 | 8 |
Last trade - 15.21pm 11/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |