STX 2.44% 20.0¢ strike energy limited

Ann: South Erregulla Success Unlocks Project Haber, page-188

  1. 1,594 Posts.
    lightbulb Created with Sketch. 3821
    Hi OT1961,
    As a previous poster has pointed out, Strike sited SE-1 off structure to prove up as much high-confidence resource as possible to underpin Haber. If the well was drilled at the crest (top) of the structure, that would prove up less resource.

    Kind regards OldGeo
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.005(2.44%)
Mkt cap ! $572.1M
Open High Low Value Volume
21.0¢ 21.0¢ 20.0¢ $1.394M 6.849M

Buyers (Bids)

No. Vol. Price($)
76 4376061 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 1473669 2
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.