Completed Operations
Since the last update, Strike has set, cemented and pressure tested the 9-5/8” casing and
commenced drilling the final production section. The well is currently drilling ahead in the
Carynginia Formation at a depth of 4,535m MD (measured depth) where the presence of
hydrocarbons is evident.
- Forums
- ASX - By Stock
- STX
- Ann: South Erregulla Update
Ann: South Erregulla Update, page-3
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.0¢ |
Change
-0.005(2.33%) |
Mkt cap ! $623.2M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 20.8¢ | $1.448M | 6.751M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
34 | 1301378 | 20.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
21.0¢ | 1032053 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
40 | 1138416 | 0.210 |
30 | 1098728 | 0.205 |
36 | 1182801 | 0.200 |
15 | 998856 | 0.195 |
27 | 1455475 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.215 | 922961 | 33 |
0.220 | 1227833 | 16 |
0.225 | 592532 | 9 |
0.230 | 971332 | 14 |
0.235 | 1403327 | 16 |
Last trade - 14.56pm 17/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online