When you call out a logging unit and crew for a perforation job you get the people and equipment to do just that. A logging unit will arrive on site with just the tools and people required for the job at hand. If a client expects a full set of logging tools to be supplied...then they pay for same.
SLBs WA base is 3-4 hours drive from the well site so it's more cost effective to call out extra tools and people as required for unplanned operations rather than have them sitting around at site on full rate and not being utilized. These days even the baskets the tools come in are charged at a daily rate.
re coiled tubing unit...you may be right but in these situations I'm used to seeing efforts made to pin down exactly where any water is coming from before getting into remedial operations.
- Forums
- ASX - By Stock
- Ann: South Erregulla Update
When you call out a logging unit and crew for a perforation job...
-
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.5¢ |
Change
0.010(4.65%) |
Mkt cap ! $643.6M |
Open | High | Low | Value | Volume |
22.5¢ | 23.0¢ | 21.5¢ | $3.339M | 14.95M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 337869 | 22.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 1651352 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 130888 | 0.225 |
5 | 84320 | 0.220 |
8 | 683720 | 0.215 |
9 | 638320 | 0.210 |
8 | 417841 | 0.205 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 1476612 | 21 |
0.235 | 945860 | 15 |
0.240 | 655722 | 13 |
0.245 | 311594 | 9 |
0.250 | 3178415 | 17 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online