Being a wireline engineer is a hard call.....youre sort of f&&&d either way you go. Drillers give wireline a hard time because they dont think theyre a critical part of the operation. Many engineers don't help this image by rigidly towing the SLB line and acting like theyre oilfield royalty while on site. I've worked with some excellent wireline crews...but I've also worked with Engineers who needed continual managing and reminding that they were a part of a bigger operation.
- Forums
- ASX - By Stock
- STX
- Ann: South Erregulla Update
Ann: South Erregulla Update, page-277
-
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
|
|||||
Last
25.0¢ |
Change
0.015(6.38%) |
Mkt cap ! $715.1M |
Open | High | Low | Value | Volume |
24.0¢ | 25.0¢ | 23.8¢ | $3.385M | 13.78M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 369888 | 24.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 472851 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 74484 | 0.245 |
37 | 797567 | 0.240 |
12 | 964420 | 0.235 |
13 | 482522 | 0.230 |
3 | 63917 | 0.225 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 472851 | 17 |
0.255 | 1034120 | 15 |
0.260 | 1190892 | 19 |
0.265 | 205870 | 8 |
0.270 | 106876 | 5 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |