STX 0.00% 20.5¢ strike energy limited

Ann: South Erregulla Update, page-277

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    Being a wireline engineer is a hard call.....youre sort of f&&&d either way you go. Drillers give wireline a hard time because they dont think theyre a critical part of the operation. Many engineers don't help this image by rigidly towing the SLB line and acting like theyre oilfield royalty while on site. I've worked with some excellent wireline crews...but I've also worked with Engineers who needed continual managing and reminding that they were a part of a bigger operation.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
20.5¢
Change
0.000(0.00%)
Mkt cap ! $586.4M
Open High Low Value Volume
20.5¢ 20.5¢ 19.5¢ $1.799M 8.954M

Buyers (Bids)

No. Vol. Price($)
13 667539 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 506260 11
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
20.3¢
  Change
0.000 ( 0.75 %)
Open High Low Volume
20.3¢ 20.5¢ 19.5¢ 3597838
Last updated 15.59pm 14/06/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.