STX 2.13% 24.0¢ strike energy limited

My mistake. Been away from Strike for a bit. Baker doing the...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    My mistake. Been away from Strike for a bit. Baker doing the wireline now?

    Most of my comments apply equally to Baker and Halliburton. They'll have an operational base in WA and Id be surprised if Baker dont go down the remote engineer route if theyre not already doing so.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
24.0¢
Change
0.005(2.13%)
Mkt cap ! $686.9M
Open High Low Value Volume
23.5¢ 24.3¢ 23.0¢ $2.375M 10.01M

Buyers (Bids)

No. Vol. Price($)
7 397363 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 496987 6
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
24.0¢
  Change
0.005 ( 2.13 %)
Open High Low Volume
23.0¢ 24.0¢ 23.0¢ 4094689
Last updated 15.59pm 10/05/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.